Bignote.....for fun....
http://pangea.stanford.edu/ERE/pdf/IGAstandard/SGW/2008/khasani.pdf
CONCLUSIONS
1. Transient numerical simulation work can be
applied to make preliminary investigation on the
characteristics of deliverability curve of a
production well.
2. The presence of maximum value of mass flow
rate shown on a deliverability curve can be
interpreted as the reservoir having high
permeability-thickness.
3. Deliverability curve obtained from numerical
simulation should be verified with both the
continuous measurement and conventional
measurement methods for wellhead and mass
flow rate.
Haha....I hope you know your calculus.
- Forums
- ASX - By Stock
- jumonville production on increase
NEO
nuenco nl
Bignote.....for...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NEO (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EL8
ELEVATE URANIUM LTD
Murray Hill, MD & CEO
Murray Hill
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online