NEO nuenco nl

Bignote.....for...

  1. 2,176 Posts.
    Bignote.....for fun....

    http://pangea.stanford.edu/ERE/pdf/IGAstandard/SGW/2008/khasani.pdf

    CONCLUSIONS
    1. Transient numerical simulation work can be
    applied to make preliminary investigation on the
    characteristics of deliverability curve of a
    production well.
    2. The presence of maximum value of mass flow
    rate shown on a deliverability curve can be
    interpreted as the reservoir having high
    permeability-thickness.
    3. Deliverability curve obtained from numerical
    simulation should be verified with both the
    continuous measurement and conventional
    measurement methods for wellhead and mass
    flow rate.

    Haha....I hope you know your calculus.

 
watchlist Created with Sketch. Add NEO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.