Is Nunasvaara remaining an open pit and Niska underground?
Will be interesting to keep an eye on the power supply.
Niska SS: "The permitting and installation of a new 130kV powerline from Svappavaara at an estimated cost of US$11M and a timeline of 3-5 years is one of the major items on the critical path."
Vittangi PFS: "The Mine will be connected to the regional grid power, requiring a new power line to be added from Svappavaara to the proposed mine substation. The grid is operated by JBF (Jukkasjärvi Sockens Belysningsförening) who confirmed that there is sufficient power that can be delivered from a local substation to the Project site via a minor upgrade to the existing overhead lines from the E45 highway."
- Forums
- ASX - By Stock
- June DFS Content
Is Nunasvaara remaining an open pit and Niska underground?Will...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TLG (ASX) to my watchlist
(20min delay)
|
|||||
Last
37.5¢ |
Change
-0.010(2.60%) |
Mkt cap ! $160.7M |
Open | High | Low | Value | Volume |
38.5¢ | 41.0¢ | 37.5¢ | $756.3K | 1.946M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 8801 | 37.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
39.0¢ | 46000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 8801 | 0.375 |
5 | 82162 | 0.370 |
4 | 52582 | 0.365 |
8 | 94146 | 0.360 |
2 | 20800 | 0.355 |
Price($) | Vol. | No. |
---|---|---|
0.390 | 46000 | 1 |
0.400 | 50000 | 1 |
0.410 | 52091 | 2 |
0.420 | 161642 | 4 |
0.425 | 76996 | 3 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
TLG (ASX) Chart |