NEO nuenco nl

just commenced testing

  1. 4,498 Posts.
    lightbulb Created with Sketch. 71
    Jumonville #1 Bullseye Prospect, Iberville Parish, Louisiana, Operator 43.33% WI


    The Company advises that the Jumonville #1 well operations have commenced testing operations. The initial
    testing program began with the perforation of the bottom 5 feet of the primary targeted interval to determine
    water saturations and the anticipated oil-water contact. These initial results confirmed that the Miogyp
    reservoir has a water drive with brackish water at the base. This should result in increased recovery
    efficiency during production.
    The testing process will now move up into the interpreted hydrocarbon interval in the upper portion of the
    reservoir and run an extended testing sequence. The Company is expecting to test a 10 foot interval near the
    formation top where several hundred barrels of oil circulated to surface when originally penetrated. This next
    testing phase should begin within the next 48 hours.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.