This is one of the main reasons we embarked on a bulk sampling programme based on 5km of PQ diamond core (85mm diameter), drilled across all ore types at Rocklands including the native copper zones, that culminated in the Phase-2, 35 tonne bulk-sample programme (average grades over 4% CuEq).
This is the bit I like from above
'drilled across all ore types at Rocklands'
and up to 17th april 2013
COARSE NATIVE COPPER ORE - 3,100 TONNES ESTIMATED 12-15% CuEq
NATIVE COPPER ORE - 7,300 TONNES ESTIMATED 8-10% CuEq
HIGH-GRADE COPPER ORE - 33,400 TONNES ESTIMATED 5-8% CuEq
LOW-GRADE COPPER ORE - 60,700 TONNES ESTIMATED 2-4% CuEq
Looks about 4% AVERAGE to me in the large stockpile
All Im saying is we were told back in April 2013.
Im sure the statistical experts can work it out from here.
The only ones that dont like to believe what they are told by the company are the ones with the large egos that think they could do a better job at setting up a new mine.
Well I think you would have been chewed up and spat out by now and never got to mining.
- Forums
- ASX - By Stock
- just quoting
This is one of the main reasons we embarked on a bulk sampling...
-
- There are more pages in this discussion • 269 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)