LTR 8.28% 78.5¢ liontown resources limited

Kathleen Valley Project Discussion, page-454

  1. 1,363 Posts.
    lightbulb Created with Sketch. 421
    It’s all go for Liontown. Wind turbines under construction and soon to be delivered to site, with solar farm deployment underway and hooked up to power plant. Cannot wait to see video footage of wind turbine installation.

    https://hotcopper.com.au/data/attachments/5382/5382640-80afd7cd3bd2929b5a4d284d1751e922.jpg
    https://hotcopper.com.au/data/attachments/5382/5382643-85df2179e80ffa065ba00ea2a0701d0c.jpghttps://hotcopper.com.au/data/attachments/5382/5382637-7fe102deff0ae53a2b7082530cb64017.jpg
    https://hotcopper.com.au/data/attachments/5382/5382646-e41fd50a2ad3a8f7653b6b9effeee912.jpg
 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.