GDY market cap: $255mill
Total funds required to build commercial scale 25MW plant: $270mill
Cash: $90mill
REDP funding: $90mill
Further grant funding expected (Geothermal drilling program): $7mill+
Additional Origin Energy commitment: $60mill+
Modest capital raising probably required in 2012, assuming technical milestones are met.
Bottom line: GDY's enterprise value at the moment is only around $65mill, which looks very cheap given non-dilutive funding sources now locked in. With a fully operational 25MW plant built by the end of 2013, and with govts craving carbon free base-load power, you'd have to be looking at an enterprise value in 2013 in the region of $700mill. In other words, assuming there are no debilitating technical set backs or massive cost blowouts (significant assumptions), it is not unrealistic to predict a return in the region of 1000% over the next 3 years.
- Forums
- ASX - By Stock
- RNE
- key numbers
key numbers
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.452M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $1.484K | 741.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1112086 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 12281983 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1112086 | 0.002 |
42 | 62124924 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 12281983 | 15 |
0.004 | 3184743 | 5 |
0.005 | 1210000 | 3 |
0.006 | 3269000 | 2 |
0.007 | 4981088 | 4 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
RNE (ASX) Chart |