So, so far we have
- Developed and Patent pending on a clean process for processing our own graphite to battery grade, a process that has been piloted successfully in Germany and put under a TM EcoGraph that has garnered global attention from Battery Manufacturers seeking environmentally friendly sourced battery grade graphite at competitive price levels ..Value X Per share
- Testing other graphite feedstocks from around the world to verify that it works equally well with these feedstocks....opening the potential to
- start processing and selling battery grade graphite otherwise sourced
- start joint development discussions EcoGraph/ battery manufacturers to develop joint owned battery grade graphite processing facilities (multiple?) ...Value X per share
So lets add some other SP affecting achievements in the last 11 months.
The NPV of the the mine (shovel ready) is a very conservative US $211m based on a a graphite price long since blown away with price rises
- Resettlement Action Plan Completed and approve .. a necessity to be shovel ready ......................Value X per share
- Sept 17, CBA increase their stake in KNL from a whopping 15, 242, 744 shares to 17, 938,334 shares....an increase from 6.27 to 7.35% of the register ...........Value X per share
The NPV of the Downstream Processing Plant a very conservative US $ 145M based on 20,000tpa
The NPV of downstream processing plants in partnership with Battery Manufacturers using EcoGraph processes and other graphite feedstock is US $ ???
The NVP of expanded production at Epanko and our other sites is US $ ????
So what do you all think we should be trading at given that 16.8c is our base value without any of the above
564xxl
- Forums
- ASX - By Stock
- KNL’s Mining Licence, downstream processing and graphite expansion
So, so far we have Developed and Patent pending on a clean...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EGR (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.9¢ |
Change
0.007(7.61%) |
Mkt cap ! $44.94M |
Open | High | Low | Value | Volume |
9.5¢ | 9.9¢ | 9.5¢ | $45.26K | 459.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1025 | 9.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 8111 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1025 | 0.099 |
1 | 100000 | 0.096 |
2 | 48421 | 0.095 |
1 | 8000 | 0.094 |
1 | 10000 | 0.093 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 8111 | 2 |
0.105 | 8200 | 2 |
0.110 | 80047 | 2 |
0.120 | 10000 | 1 |
0.125 | 2864 | 1 |
Last trade - 11.20am 13/09/2024 (20 minute delay) ? |
Featured News
EGR (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online