Anyone able to confirm if the first stage is at max capacity? Only seems to get to 22MW, is it being staged or does the proposed 50MW include the second phase?
- Forums
- ASX - By Stock
- KSP1 Construction Tracking
Anyone able to confirm if the first stage is at max capacity?...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)