FDR finder energy holdings limited

KTJ Project Thread

  1. 4,316 Posts.
    lightbulb Created with Sketch. 2165


    Although I am not the best at conveying my investment theories and ideas (due diligence) on paper for everyone to read, (they do exist, but they rotate through my head too quickly to write down in time and in a coordinated way), one thing I do excel in is finding information, which then can be easily saved, referenced and shared. That is what I have done below, shared information about analogous sister projects to KTJ (literally connected to the same PSCs at one point) so that everyone can read at their own pace, and understand why KTJ will almost certainly go into production and generate significant cashflows.



    You’ll find that KTJ sits squarely in the middle of both analogous projects (literally and figuratively), sharing water depth with one, resource type and size with the other, capital expenditure between the two, oil grade, production rate, discovery timeline, players involved etc. There’s a couple of easy things we can do with this information, we can make a comparison between these projects and our own and then use that to justify an expected outcome for KTJ. We can also look at the statements FDR make about project (timelines, supportive government, production rates etc) and see if those things are realistic and have happened historically with the other projects. Spoiler: they have, a quick example would be the Kitan timeline of Acquisition, Exploration, Development and Production only taking 3.7 years, that is incredibly quick and it justifies FDR’s production timeline, i.e. it’s a real world example, right next door to us, utilising the same development concept, same number of wells and possibly even the same FPSO (Glas Dowr).


    Anyway, if you are interested or invested in the Timor Leste project, read on.




    KTJ Project



    License: PSC-19-11


    Operator: Finder


    Contingent Resources: 22Mmbbls (Project 2C Gross)


    Reserves: 16Mmbbls (Project) (Expected)


    Year Discovered: 1996+


    Location: Bonaparte Basin | Timor Sea | 550km NW of Darwin


    Acquisition Cost: US$0.38bbl (Cost per Bbl. 2C Resource @Fid)


    Equity: FDR 76% | Timor Gap 24%


    Royalty: 10% (5% Timor Leste | 5% ENI/Inpex)


    Capital Expenditure: US$270M (Expected)


    Water Depth: 400m


    Oil Grade: 53d API


    Peak Production Rate: 25,000 – 40,000bopd (Expected)


    Total Field Production: 16,000,000 Barrels (expected, Source: Research Report)


    Production Revenues: US$1.2B (expected)


    Field Life: 10 years


    Notable Events: Alliance Agreement and Fast Tracked FEED with Schlumberger. FDR production forecast estimate equals to AU$1B revenues in first 18 months. Bluewater Glas Dowr (See Kitan info below) offering vessel and engineering to FDR




    https://finderenergy.com/wp-content/uploads/2025/05/250528_FDR.AX-Seismic-data-repro-advances-Kuda-Tasi.pdf


    https://finderenergy.com/wp-content/uploads/2024/11/241111_FDR.AX-Kuda-Tasi-Jahal-Dominate-Activity.pdf


    https://wcsecure.weblink.com.au/pdf/FDR/02955354.pdf


    https://www.linkedin.com/posts/finder-energy_fdr-ktjproject-slb-activity-7340561847571423232-EscH?utm_source=share&utm_medium=member_desktop&rcm=ACoAAA029okBS2YBRxutDgididUHUBNzQAWiO80


    https://www.upstreamonline.com/field-development/project-breakthrough-imminent-on-timor-leste-offshore-discoveries/2-1-1831838






    Analogous Projects



    Buffalo Oil Project (1999)




    License: WA-260-P


    Operator: BHP


    Contingent Resources: N/A


    Probable Reserves (): 20Mmbbl


    Year Discovered: 1996


    Location: Timor Sea | 560km NW Darwin


    Acquisition Cost: Unknown/NA


    Equity: BHP 50% | Canadian Occidental 50%


    Royalty: Unknown. Presumed 5% to Timor Leste


    Capital Expenditure: US$88M in 1999 (US$170M in 2025 terms)


    Water Depth: 30m Wells, FPSO 300m


    Development Wells: 2


    Oil Grade: 53d API, 120 GOR


    Peak Production Rate: Between 40,000 - 50,000bopd (depending on source)


    Total Field Production : 12,495,863 Barrels


    Production Revenues: US$374M (US$668M in 2025 terms)


    Field Life: 3 Years


    Notable Events: BHP agrees to sell half its equity for US$38M (Adjusted) in 2001 after majority of field production expended. Schlumberger part of engineering and construction management team for topsides




    https://www.offshore-technology.com/projects/buffalo-field-timor-sea/?cf-view

    https://www.laohamutuk.org/OilWeb/OTD_FS/Buffalo.htm


    https://www.laohamutuk.org/Oil/Project/Buffalo/CarnarvonBuffPresApr2018.pdf


    https://www.investegate.co.uk/announcement/rns/bhp-group-limited-npv-di---bhp/first-oil-from-buffalo-/125072


    https://www.tandfonline.com/doi/pdf/10.1071/ASEG2001ab099


    https://gulfnews.com/business/energy/bhp-sells-buffalo-stake-to-interoil-1.435811


    https://www.tandfonline.com/doi/pdf/10.1071/ASEG2001ab099





    Kitan Oil Project (2011)




    License: PSC JPDA 06-105


    Operator: ENI (40%)


    Contingent Resources:


    Probable Reserves ():


    Year Discovered: 2008


    Location: Timor Sea | 550km NW Darwin (JPDA)


    Acquisition Cost: Unknown


    Equity: ENI 40% | Inpex 35% | Talisman 25%


    Royalty: 5% Timor Leste


    Capital Expenditure: US$1B Est


    Water Depth: 350m
    Development Wells: 3


    Oil Grade: 53d API, 120 GOR


    Peak Production Rate: 45,000bopd


    Total Field Production: 26,906,980 Barrels (Calculated from ANP Annual Reports)


    Production Revenues: >US$2.7B


    Field Life: 4 Years


    Notable Events:September 2007 Woodside sold its 40% share in the contract to the Italian company Eni for USD$23 million (US$44M), and Eni took over as operator. Bluewater Glas Dowr FPSO Engineered for Gas/Liquids and leased for project. Full Acquisition – Discovery – Development – Production time of 3.5 years.




    https://www.offshore-technology.com/projects/kitanoilfield/?cf-view


    https://www.laohamutuk.org/Oil/Project/Kitan/10EniKitan.htm


    https://www.laohamutuk.org/Oil/Project/Kitan/EISOct10/EniKitanWebpage.pdf


    https://www.inpex.com/english/news/english/news/assets/pdf/e20111011.pdf


    https://www.publish.csiro.au/ep/pdf/AJ12050(Notable similarities to KTJ)


    https://timor-leste.gov.tl/?p=2746&print=1&lang=en


    https://www.eni.com/assets/documents/eni_australia_2016_eng_ese_web_pagine_singole.pdf


    https://www.youtube.com/watch?v=MkQ9u20jE4I


    https://www.laohamutuk.org/Oil/PSCs/ANP/ANPAR2011En.pdf


    https://www.laohamutuk.org/Oil/PSCs/ANP/ANPAR2012en.pdf


    https://www.anp.tl/wp-content/uploads/2022/08/FINAL-Annual-Report-2013-ENGLISH.pdf


    https://www.anp.tl/wp-content/uploads/2022/08/Annual-Report-2014-rev-English.pdf


    https://www.anp.tl/wp-content/uploads/2022/08/RO-Annual-Report-2015-ENGLISH-FINAL.pdf




    Last edited by Onspeed: 22/06/25
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
6.8¢
Change
-0.002(2.86%)
Mkt cap ! $22.82M
Open High Low Value Volume
7.0¢ 7.0¢ 6.8¢ $27.98K 409.0K

Buyers (Bids)

No. Vol. Price($)
3 145758 6.8¢
 

Sellers (Offers)

Price($) Vol. No.
7.0¢ 97499 1
View Market Depth
Last trade - 13.45pm 25/07/2025 (20 minute delay) ?
FDR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.