Certainly endorse that.
Could I also query the 60 days assumption which I have seen made on these threads.
My read is the Dry plant is now in early production.
Adam confirmed the Wet plant has now commenced commissioning.
The 85% was a measure as at 31 March, that is almost 5 weeks ago. And we know that construction activities then outstanding included the paste plant for UG, and for the remaining wind turbines. None of that is critical path to first production, I assume, given we have tonnes of rock on standby and other power sources.
I would not be surprised if first spod emerged sooner than 60 days!.
- Forums
- ASX - By Stock
- LTR
- KV 85% complete, commissioning begun
KV 85% complete, commissioning begun, page-16
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
80.0¢ |
Change
-0.010(1.23%) |
Mkt cap ! $1.940B |
Open | High | Low | Value | Volume |
83.5¢ | 84.0¢ | 80.0¢ | $8.438M | 10.32M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 93085 | 80.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
80.5¢ | 52300 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 76835 | 0.800 |
13 | 300078 | 0.795 |
20 | 442312 | 0.790 |
7 | 103544 | 0.785 |
24 | 230288 | 0.780 |
Price($) | Vol. | No. |
---|---|---|
0.805 | 52300 | 2 |
0.810 | 83967 | 4 |
0.815 | 203350 | 6 |
0.820 | 150600 | 4 |
0.825 | 71592 | 5 |
Last trade - 16.10pm 14/08/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |