They have to get the port up and running, before they destroy...

  1. 3,706 Posts.
    lightbulb Created with Sketch. 184
    They have to get the port up and running, before they destroy all the seagrass, with a giant offshore, Chinese backed, wind farm.
    No materials for this monstrosity, will be procured from Australia. Another win for Bowen. Not.
    Plus the cost of removing them all, when they are stuffed in 20 years.
    Add micro particles of BPA from the blades, in the water. A known endocrine effector/disruptor, in a fish breeding area?

    https://www.dcceew.gov.au/energy/renewable/offshore-wind/areas/bunbury
    https://reneweconomy.com.au/bowen-u...nd-zone-with-room-for-up-to-20gw-of-turbines/
    https://www.abc.net.au/news/2021-05...d-wind-energy-projects-off-wa-coast/100108572
    Last edited by goldscraper: 15/03/24
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.