They have to get the port up and running, before they destroy all the seagrass, with a giant offshore, Chinese backed, wind farm.
No materials for this monstrosity, will be procured from Australia. Another win for Bowen. Not.
Plus the cost of removing them all, when they are stuffed in 20 years.
Add micro particles of BPA from the blades, in the water. A known endocrine effector/disruptor, in a fish breeding area?
https://www.dcceew.gov.au/energy/renewable/offshore-wind/areas/bunbury
https://reneweconomy.com.au/bowen-u...nd-zone-with-room-for-up-to-20gw-of-turbines/
https://www.abc.net.au/news/2021-05...d-wind-energy-projects-off-wa-coast/100108572
- Forums
- Political Debate
- Kwinana’s $4b Westport project referred to EPA ahead of 2032 estimated completion date
They have to get the port up and running, before they destroy...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online