I don't think kpmg would be in any position to get accurate...

  1. 560 Posts.
    I don't think kpmg would be in any position to get accurate costings done in a week, it's just a distraction to stretch out the process.
    Talk about smear, the libs will be scrambling like mad looking for a game breaker.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.