On the 27th August 2011..it will be exactly 4 yrs that the Malaysian Gov. approved the go ahead for the LAMP at Gebeng.
The only delay that I can recall was with the floatation tanks delivery and that didnt stop work on other parts of the project.
So basically with what we have read progressively, up to a 1000 workers/contractors etc continually move in and out.
If its finished say by Xmas or even after..its a guage for us (4-5 yrs)to build a Processing Plant from A-Z.
Chihawk..You are the Moly expert,can you give us a quick up date as to what stage they are at.
LYC holders with interests in ARU and ALK..if you can kindly do same.
Hard to get a real time start all up,as Ashtons etc had spent some $25 M on drillings before LYC took over.
THe stopage during the GFC and Refinancing..but its fair to say its taken about 13 yrs to get this far.
Nursery ..around 13 yrs ..would that be close ???
Just gives us a better perception of how the OTHERS match up in this RACE TO THE FINISH LINE.
Others with other REE holdings might like to contribute updates as well.
- Forums
- ASX - By Stock
- LYC
- lamp
lamp
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.43 |
Change
0.055(0.86%) |
Mkt cap ! $6.005B |
Open | High | Low | Value | Volume |
$6.45 | $6.49 | $6.42 | $2.106M | 326.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 9076 | $6.42 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.43 | 5596 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 9072 | 6.420 |
19 | 19848 | 6.410 |
13 | 22338 | 6.400 |
11 | 17407 | 6.390 |
10 | 24819 | 6.380 |
Price($) | Vol. | No. |
---|---|---|
6.430 | 3998 | 15 |
6.440 | 20229 | 23 |
6.450 | 21373 | 18 |
6.460 | 28244 | 13 |
6.470 | 28059 | 11 |
Last trade - 11.09am 09/07/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |