Hi, OPEX of 360$ per tonne based on nameplate capacity of...

  1. 2,426 Posts.
    lightbulb Created with Sketch. 504
    Hi, OPEX of 360$ per tonne based on nameplate capacity of 6,000tpa or 500 tonnes per month. This puts BSM as one of the lowest cost producers of graphite in the world. Hope that helps.

    Source, section 4.6 of this document (expected 180.000$ opex for 5 months)
    http://www.asx.com.au/asxpdf/20170922/pdf/43mk2txgmmmdsp.pdf
    Last edited by DoctorFouad: 01/11/17
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.