The last ann stated that the well head pressure test indicates that the well would benefit from a larger fracture stimulation. Is there any reason why they would not be doing this at this time? I.e time taken to remove frac fluid.
The ann also indication that tenders for gas are being considered etc. That gave me the impression that they would connect the pipeline before running the fracture stilulation. Can they still do the large frac stimulation when the pipelines are connected? What would be best practice?
Was there any benefit from running the well head pressue test?
GDN Price at posting:
5.0¢ Sentiment: ST Sell Disclosure: Held