ARL 2.33% 44.0¢ ardea resources limited

When can we expect results starting to coming in from latest...

  1. 205 Posts.
    lightbulb Created with Sketch. 9
    When can we expect results starting to coming in from latest drilling? Anyone have a clue?

    Advancement of deposits from Kalpini, Highway , Yerilla camps to KNP Cobalt Zone throught strategic drilling
    • Around 40 000 meters RC drill programs
    • Metallurgical testing, resource definition and modelling

    Drilling at Goongarrie, Black Range, Siberia, Aubilis Camps
    • Resource upgrades for Co, Ni, Sc, Pt, Pd as appropriate ( at least 25 000 meters RC drilling)
    • Reserve definition at Patricia Ann, Goongarrie South (around 45 000 meters RC drilling)
    • Metallurgical variability samping in preparation for DFS (~4 500 meters diamond drilling
    Could be a quite nice trigger besides the PFS of course?
 
watchlist Created with Sketch. Add ARL (ASX) to my watchlist
(20min delay)
Last
44.0¢
Change
0.010(2.33%)
Mkt cap ! $87.86M
Open High Low Value Volume
46.0¢ 46.5¢ 44.0¢ $49.91K 109.8K

Buyers (Bids)

No. Vol. Price($)
1 18106 44.0¢
 

Sellers (Offers)

Price($) Vol. No.
45.5¢ 2775 2
View Market Depth
Last trade - 15.59pm 02/09/2024 (20 minute delay) ?
ARL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.