If the resource stacks up then the CAPEX, while possibly problematic, is not so much the problem - more the time to design and build the plant.
Plus, these laterite acid leach plants are more or less a chemical process and ramp up to full production usually takes a few years after the initial commissioning takes place. Lots of little details of process and materials of construction need to be worked out. I know, I have been there.
Could easily be 5 years minimum to economic production.
Interested in any informed discussion about these issues.
- Forums
- ASX - By Stock
- ARL
- Largest cobalt resource with lowest valuation
Largest cobalt resource with lowest valuation, page-49
-
- There are more pages in this discussion • 2,531 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARL (ASX) to my watchlist
(20min delay)
|
|||||
Last
44.5¢ |
Change
-0.005(1.11%) |
Mkt cap ! $88.85M |
Open | High | Low | Value | Volume |
45.0¢ | 46.0¢ | 44.0¢ | $95.07K | 212.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 25234 | 44.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
49.0¢ | 15000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 25234 | 0.445 |
1 | 13137 | 0.440 |
2 | 21150 | 0.435 |
2 | 1700 | 0.420 |
1 | 20000 | 0.415 |
Price($) | Vol. | No. |
---|---|---|
0.490 | 15000 | 1 |
0.520 | 10575 | 2 |
0.540 | 10000 | 1 |
0.545 | 78038 | 1 |
0.560 | 15000 | 1 |
Last trade - 16.10pm 14/08/2024 (20 minute delay) ? |
Featured News
ARL (ASX) Chart |