If the resource stacks up then the CAPEX, while possibly problematic, is not so much the problem - more the time to design and build the plant.
Plus, these laterite acid leach plants are more or less a chemical process and ramp up to full production usually takes a few years after the initial commissioning takes place. Lots of little details of process and materials of construction need to be worked out. I know, I have been there.
Could easily be 5 years minimum to economic production.
Interested in any informed discussion about these issues.
- Forums
- ASX - By Stock
- ARL
- Largest cobalt resource with lowest valuation
Largest cobalt resource with lowest valuation, page-49
-
- There are more pages in this discussion • 2,531 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARL (ASX) to my watchlist
|
|||||
Last
48.3¢ |
Change
-0.038(7.21%) |
Mkt cap ! $100.8M |
Open | High | Low | Value | Volume |
52.0¢ | 52.0¢ | 48.0¢ | $57.04K | 114.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 9387 | 48.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
50.0¢ | 1020 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 9387 | 0.480 |
1 | 2129 | 0.470 |
3 | 13968 | 0.465 |
3 | 18475 | 0.460 |
4 | 86219 | 0.455 |
Price($) | Vol. | No. |
---|---|---|
0.500 | 1000 | 1 |
0.505 | 561 | 1 |
0.510 | 2192 | 1 |
0.520 | 10000 | 1 |
0.530 | 50950 | 1 |
Last trade - 11.38am 16/07/2024 (20 minute delay) ? |
Featured News
ARL (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, CEO / Non-Exec Director
James Graham / Dr Alan Dunton
CEO / Non-Exec Director
SPONSORED BY The Market Online