1. More or less confirms that 2mmcfpd from Warro will be commercial
2. Latent suggests that >4.5 mmcfpd should be able to be produced, at a stable rate, with a successful cement squeeze on the water-producing Zones
3. An additional 1 mmcfpd is likely, from sales of oil condensate
4. Successful fraccing of Zones 7 & 8 might add the same production as is coming from Zone 6 (~1mmcfpd)
So we're looking like getting something like 6.5mmcfpd from this one well alone? Most of which has already been seen, though this is assuming some luck with Zones 7&8.
TSV Price at posting:
2.5¢ Sentiment: Hold Disclosure: Held