Seems like Hole 4 had to be abandoned due to collapse drill hole, can happen when drilling sub-parralel to foliation/shearing. However hole 4 howver further confirms secondary copper minerisation near surface (as per previous drilling).
Hole 6 drilling more perpendicalar to interpreted shearing increaing chances of drilling through shear.
Not sure why they aren't drilling the core of the chargeable zone at 200m depth further to the south though? Access? Lack of results in hole 6 doesn't downgrade chargeable zone to south however any positive results will support the chargeable zone. I would direct hole 7 into this.
My opinions from the sideline only.
- Forums
- ASX - By Stock
- latest announcement
Seems like Hole 4 had to be abandoned due to collapse drill...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EQE (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $12.65M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
EQE (ASX) Chart |
Day chart unavailable
The Watchlist
LGP
LITTLE GREEN PHARMA LTD
Paul Long, CEO
Paul Long
CEO
Previous Video
Next Video
SPONSORED BY The Market Online