TRY 0.00% 3.0¢ troy resources limited

Latest oustanding drill results, page-4

  1. 60,675 Posts.
    lightbulb Created with Sketch. 727
    Yes, report also mention this could be the location for a starter pit requiring minimal development costs.

    Would be tempting to start pulling ore out to feed the mill once the haul road is complete and I suppose that is an option should they need to.

    But what I am looking forward to is the initial resource estimate.

    "In the 1st of February 2019 announcement, Troy suggested that Ohio Creek might encompass a series of mineralised sections which are thus not continuous, and hence development might well involve a series of pits rather than one large pit.

    Whilst that might well remain the situation, it is in turn noted that a
    continuous mineralised section to the north-west at Ohio Creek is now of a length of approximately 500 metres and open to the north-west, meaning that individual pits might nevertheless potentially be of substantial size."

    Still a lot of infill drilling to do as well as testing the extensions N/E
    and S/W, also TRC089 had 3 g/t oz at the bottom of the hole so still open at depth
 
watchlist Created with Sketch. Add TRY (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.