report from ggp
Fausse Point Project
TGR Well # 1, Fausse Point Project, Iberia Parish, Louisiana,
.
The completion of the production facility has been slightly delayed with production expected to commence in
Mid May.
Analysis to date indicates that the lowest zone (8,370 feet) is possibly connected to a much larger
hydrocarbon accumulation, and that this well has only just penetrated the edge of this larger accumulation.
While this zone now being completed for production was not an original target of this well, it has the
potential to represent a new play type.
the thing that i take from this report is that after a couple of months of analysing, they STILL think that the lowest zone might be connected to a larger HC accumilation.