FAR 0.00% 49.0¢ far limited

You should have already seen it BB. If not read on....DRILLING...

  1. 120 Posts.
    You should have already seen it BB. If not read on....

    DRILLING UPDATE
    Wei 6-12E-1 Exploration Well, Beibu Gulf Block 22/12, Offshore China

    Well re-spudded as Wei 6-12E-1A
    We have been advised by the operator, ROC Oil (China) Company, that since its last Stock Exchange Release on 13 February 2008, the Premium "Murmanskaya" jack-up rig has re-spudded the Wei 6-12E well as Wei 6-12E-1A.

    The well was required to be re-spudded due to problems associated with retrieving stuck drill pipe. Wei 6-12E-1A is located approximately two metres from the original hole. The wells target remains unchanged: a stratigraphic-structural prospect, approximately 1.7 kilometres east of the Wei 6-12S-1 oil discovery.

    As at 0600 (local time) on 20 February 2008 the well had been drilled to 253 mBRT and the current operation is repairing the top drive.

    Wei 6-12E-1A, the second of the planned three well exploration/appraisal programme in Block 22/12, Beibu Gulf, offshore China, is expected to reach the proposed Total Depth of approximately 2,520 mBRT by early March 2008.
    Participating Interests in Block 22/12 Joint Venture are:
    Roc Oil (China) Company 40%. (Operator)
    Horizon Oil Limited 30%
    Petsec Petroleum* 25%
    Oil Australia Pty Ltd** 5%
    The above interests are subject to Government participation in developments of up to 51%
    *a subsidiary of Petsec Energy Ltd **a subsidiary of First Australian Resources

    Schwing #2 Well, South Grosse Tete, Iberville Parish, South Louisiana

    Drilling ahead at 13,085 feet – FAR (0-14,500 feet 5%)(>14,500 feet 17.7%)
    Since the last report the well has been deepened to 13,085 feet. Current operations comprise drilling ahead. The primary target TD is 14,500 feet.

    As reported earlier, 11 feet of gas pay has been identified in the Upper Marg Tex interval and a probable 5 feet of gas pay in the Lower Marg Tex interval of the Schwing #2 well.

    The project is being operated by Spartan Operating Company, Inc. FAR’s interest is subject to a back-in of 25% after cost recovery is achieved on a full project basis. Other participants include ASX listed Amadeus Energy Limited (AMU).
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
49.0¢
Change
0.000(0.00%)
Mkt cap ! $45.28M
Open High Low Value Volume
49.0¢ 49.0¢ 49.0¢ $10.77K 21.98K

Buyers (Bids)

No. Vol. Price($)
1 14178 49.0¢
 

Sellers (Offers)

Price($) Vol. No.
50.0¢ 20000 1
View Market Depth
Last trade - 12.19pm 25/07/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.