Believe roughly 21,500 dmt spod for the remaining balance of 45,000 dmt 2016 contract. (1st shipment = 10,000 mt, 2nd shipment = 14,000 wmt)
I think the 1st shipment was wmt and there was a slight penalty on tonnage due to moisture of roughly 500 tonnes. Therefore 45,000 - 23,500 = 21,500 dmt shipped.
Either way 2016 contract is complete and we look forward to the huge 2017 contract prices!