ELK 0.00% 1.4¢ elk petroleum limited

progress

  1. 336 Posts.
    First stage is to drill the 12-1/4 inch bore to 1500 feet and change the bit to 8-3/4 inch to complete the 6900 feet depth.
    Does the casing at 1500 feet have to be installed before the rest of the bore can be completed. If so not much drilling would have been done yet.
 
watchlist Created with Sketch. Add ELK (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.