• Mining, Cartage and Crushing Contractors gearing up for expansion • Plant Design and Construction Engineer Appointed • Power House Generator Sets Ordered • Equipment Suppliers and Design Engineer Personnel on Site • Expansion Fully Funded Matrix Metals Limited (Matrix) is pleased to announce that following its decision in December 2007 to increase the annual production of the Leichhardt copper cathode project from 5,500 tpa to 9,000 tpa of copper cathode (an increase of some 60%), upgrade activities are progressing well.
MRX Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held