Reflecting on the Allkem Borefield (the Stage 1, and the new bores of Stage 2 which are right on the limit against LAC parcel).
I think that we not just have a JORC, and I think we have a project already !!!
AKE's Stage 1 borefield has 21 Bores to feed a 20,000 tpa plant. Their ground yield is 5%.
LEL yield (as it sits on sand, is 15%, 3 times better). LEL should satisfy similar plant with only 7 bores.
Below placement of 7-9 bores (green dots), right on already-proven sandstone Lihtium-rich brine tested so far. Given the concentration is 500ppm, instead AKE's 650ppm, we can produce 25% less, say 15,000 tpa. Still big time profitable.
- Forums
- ASX - By Stock
- LEL
- LEL - The Sleeping Giant
LEL - The Sleeping Giant, page-12
-
- There are more pages in this discussion • 1,162 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $56.00M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 12171 | 50.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
54.5¢ | 954 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 12171 | 0.500 |
1 | 10000 | 0.485 |
1 | 10000 | 0.475 |
2 | 5750 | 0.440 |
2 | 12325 | 0.430 |
Price($) | Vol. | No. |
---|---|---|
0.545 | 954 | 1 |
0.550 | 3323 | 3 |
0.560 | 10520 | 2 |
0.580 | 49960 | 1 |
0.585 | 10000 | 1 |
Last trade - 16.12pm 29/04/2024 (20 minute delay) ? |
Featured News
LEL (ASX) Chart |
Day chart unavailable