Thanks mate. Let me know if I dont have it right.
So hx or not won't impact slab requirements but the build type will. For example brick veneer could have outer bricks done by hand or hx without change in slab if the timber or steel frame walls were to stay as the structural walls. If using brick as structural walls this may change slab requirements and isn't often the case in Victoria due to costs.
So to be competitive in Vic one consideration would be to simply put outer bricks up that are not structural.
- Forums
- ASX - By Stock
- Let’s ignore the clowns
Thanks mate. Let me know if I dont have it right.So hx or not...
-
-
- There are more pages in this discussion • 57 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
-0.004(9.30%) |
Mkt cap ! $188.1M |
Open | High | Low | Value | Volume |
3.9¢ | 4.0¢ | 3.7¢ | $601.9K | 15.75M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 41342 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.9¢ | 252457 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 41342 | 0.038 |
27 | 4421452 | 0.037 |
10 | 2592631 | 0.036 |
15 | 2482455 | 0.035 |
8 | 423183 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.039 | 252457 | 1 |
0.040 | 1665221 | 5 |
0.041 | 500000 | 1 |
0.042 | 790000 | 2 |
0.043 | 98279 | 3 |
Last trade - 16.10pm 04/11/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |