Just off the top of my head
Pond 1......30bbls/day (already there)
Pond 2 and 3....470bbls/day
Current production is 85bbls/d and rising, so they are required install at least Pond 2. This would also take care of Gin Gin West which was previously 50bbls/day. We await the test results of GGW-1 (will probably depend on the pressure differential between the two wells).Hell that test was nearly a month ago and still stum.
Toppy,
Monumental it could be. Don't forget they appear to have fracked-up the Upper D Sands and are going back to try and fix it up.
- Forums
- ASX - By Stock
- EGO
- Lets look at a hypothesis for a Farm-in?
Lets look at a hypothesis for a Farm-in?, page-25
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EGO (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online