SDL 0.00% 0.6¢ sundance resources limited

32T axle load enables approximately 107 Wet Tonne loading per...

  1. 286 Posts.
    lightbulb Created with Sketch. 3
    32T axle load enables approximately 107 Wet Tonne loading per carriage.

    Latest Investor Presentation states 28 hour round trip (312 trips per train per year) with 3 locos and 180 wagons per train.

    312 x 107 x 180 = 6,009,120 Tonnes per train per year.

    We would need 6 trains to achieve 35Mt per annum (a train departing every 4 hours).

 
watchlist Created with Sketch. Add SDL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.