Just remember:
Individual samples collected from the Dubbo BM37 Bonanza Zone have previously assayed gold grades in excess of 1% (10,000g/t).
http://www.asx.com.au/asxpdf/20131128/pdf/42l7905fm8km15.pdf
![]()
![]()
Also remember:
Currently consents allow for up to 20,000 cubic meters of ore per annum to be removed from the mine.
www.asx.com.au/asxpdf/20160520/pdf/437cwgdsbsns70.pdf
How many tons per cubic meter of talisman ore?![]()
Just remember: Individual samples collected from the Dubbo BM37...
Add to My Watchlist
What is My Watchlist?