30 May 2018
What nonsense JPS.
The refining work is the last needed . With results in the first few weeks of June that's virtually now, and the moisture analysis on the two locally sourced coal samples, results in July. My conversation with the good doc was very different to your statement. Things are moving on nicely. Stop down ramping. Its getting old.
TESTWORK PROGRAM PROGRESS UPDATE
Kogi Iron Limited (ASX: KFE, "Kogi", "the Company") is pleased to report on the progress of metallurgical testwork associated with the commercialisation of the Agbaja Cast Steel Project in Kogi State, Nigeria.
Additional supplies of reagent materials were required to conduct enhanced bulk refining testwork and these have been delivered to our consultants in South Africa and testwork by Mintek has recommenced.
It is anticipated that this refining testwork will be the last needed, with results expected during the first few weeks in June.
Similarly, chemical and moisture analysis on the two locally sourced (Nigerian) coal samples is in progress in the Torex laboratories in Russia. This will be followed by rotary kiln testing. Results are expected to be available in July.
- Forums
- ASX - By Stock
- M4M
- Letter to shareholders
Letter to shareholders, page-78
-
- There are more pages in this discussion • 122 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add M4M (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $76.08M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1029302 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.0¢ | 13000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1029302 | 0.022 |
7 | 1443048 | 0.021 |
11 | 2584500 | 0.020 |
18 | 2919699 | 0.019 |
12 | 2049999 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 13000 | 1 |
0.021 | 300365 | 4 |
0.022 | 1200000 | 2 |
0.023 | 330303 | 2 |
0.024 | 385250 | 3 |
Last trade - 09.32am 02/10/2024 (20 minute delay) ? |
Featured News
M4M (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online