Horsetrader1 Originally the onshore pluto operation envisaged 2 trains. 1 first and the other after enough gas had been proven/discovered. It doesn't cost twice as much to build the 2nd train but you will return more than double the profits as operating costs would not double, because of existing infrastructure eg loading facility etc. It is therefore highly desirable to build the 2nd train once gas has been sourced. There is room available at the site for the 2nd train as they have to be built on same level ground. Another benefit of a 2nd train is when one has to be taken offline for maintenance/shutdowns. Shutdowns don't always go to plan which could put supply contracts with customers at risk having to source a cargo elsewhere for the customer. Anyway the short of it is I think they are keen as mustard to find the gas for the 2nd train. Then watch your divi increase.
- Forums
- ASX - By Stock
- leviathan near
Horsetrader1 Originally the onshore pluto operation envisaged 2...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WDS (ASX) to my watchlist
|
|||||
Last
$27.52 |
Change
0.270(0.99%) |
Mkt cap ! $52.25B |
Open | High | Low | Value | Volume |
$27.36 | $27.59 | $27.23 | $347.5M | 12.37M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 167313 | $27.51 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$27.53 | 2000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 27.510 |
5 | 3240 | 27.500 |
1 | 726 | 27.480 |
1 | 25 | 27.470 |
1 | 1535 | 27.460 |
Price($) | Vol. | No. |
---|---|---|
27.560 | 1000 | 1 |
27.600 | 6651 | 10 |
27.610 | 582 | 1 |
27.620 | 37 | 1 |
27.630 | 1000 | 1 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
WDS (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online