SOR 1.22% 4.2¢ strategic elements limited

After weeks of waiting the Leviathan permit, E69/3726, was...

  1. 11,159 Posts.
    lightbulb Created with Sketch. 1875
    After weeks of waiting the Leviathan permit, E69/3726, was granted to SOR today.

    This will now enable SOR to move forward with their plans for this highly prospective permit.

    SOR has access to co-contributions from the WA government for drilling Leviathan via the EIS funding but has to drill before 31/12/20. So I look forward to their next update.

    For more info about this permit and the adjacent E69/3727 see this thread:

    https://hotcopper.com.au/threads/madura-province.4996161/
 
watchlist Created with Sketch. Add SOR (ASX) to my watchlist
(20min delay)
Last
4.2¢
Change
0.001(1.22%)
Mkt cap ! $19.45M
Open High Low Value Volume
4.1¢ 4.2¢ 4.1¢ $3.095K 75.21K

Buyers (Bids)

No. Vol. Price($)
3 341980 4.1¢
 

Sellers (Offers)

Price($) Vol. No.
4.2¢ 868673 3
View Market Depth
Last trade - 15.13pm 13/09/2024 (20 minute delay) ?
SOR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.