Lib's FTTN - 'Completely stuffed it', page-50

  1. 24,289 Posts.
    lightbulb Created with Sketch. 1
    The LNP broke the NBN on purpose.

    Since the Telstra deal was completed in 2012, construction was being ramped up, that was up until the LNP halted\slowed the construction phase in 2013.


    As for the GP Super Clinics, there are well over 40 open.

    GP Super Clinic locations
    http://www.health.gov.au/internet/main/publishing.nsf/Content/pacd-gpsuperclinics-locations
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.