libs to build dams, page-9

  1. 9,311 Posts.
    lightbulb Created with Sketch. 845
    This is how the SA Labor Govt. has responded to the increased flow in the Murray -

    "Levels in the river are at a 20-year high but in South Australia, the Rann Labor Government is still holding Riverland irrigators to ridiculously restrictive rules that hold them to less than 70 per cent of their annual water allocations,forcing them to use ''imported '' water to ensure their crops survive."

    Ackerman - Sydney Daily Telegraph - Jan. 7th 2011


 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.