RLC 0.00% 0.3¢ reedy lagoon corporation limited

Going by CAD anns it took them 3-4 weeks for site prep at CM....

  1. 2,010 Posts.
    lightbulb Created with Sketch. 661
    Going by CAD anns it took them 3-4 weeks for site prep at CM. They were RC drilling not DD though..

    Im guessing 2 weeks or less.

    AIMO GLTAH
    Last edited by riseabove: 15/01/18
 
watchlist Created with Sketch. Add RLC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.