-
Share
30,390 Posts.
1863
31/10/23
21:19
Share
LTR at a different stage in the mine development, we are still at the ultra early stage.
AND shaping up to be tier 1 asset.
The dynamic nature of this with drill results etc means if SP doesn't respond (it should) at least the bid price must eventually respond.
There's a lot of rubbish about lithium bubble going on right now.
-