My guess is that there is a problem with the process, and they are working diligently to repair what is happening, they are most likely using "the old no news is better than bad news theory", which is either protecting the share price from further manipulation or helping to drive it down as has been happening.
I guess it depends which camp your in.
I would think if there is a problem, which I do think, I would say due to the length of time involved that it isn't software but plant equipment and the process and achieving the high % of purity which has been promised.
If this is true, it could take a little longer.
Just my opinion.
- Forums
- ASX - By Stock
- 1MC
- Likely Production Ramp Up Percentage
Likely Production Ramp Up Percentage, page-107
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 1MC (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.1¢ |
Change
-0.003(8.82%) |
Mkt cap ! $7.661M |
Open | High | Low | Value | Volume |
3.3¢ | 3.5¢ | 3.1¢ | $9.445K | 297.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 32621 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 119808 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 32621 | 0.031 |
1 | 67000 | 0.030 |
2 | 331281 | 0.029 |
1 | 125000 | 0.028 |
2 | 95000 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 119808 | 2 |
0.035 | 97499 | 3 |
0.039 | 559197 | 5 |
0.041 | 45200 | 1 |
0.043 | 128324 | 2 |
Last trade - 10.50am 06/08/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |