They are aiming at 350ktpa for the demonstration plant.
That will be far from producing 30ktpa concentrate.
At 80% recoveries and 2.5% headgrade, that would be around 7ktpa of 60% concentrate for 4.2ktpa TREO content which would be around ~100m$au in revenue before concentrate payability deductions.
The phase 2 plant is aiming at 1.5mtpa which, with same recoveries and headgrade, will then produce 30ktpa of 60% concentrate for 18ktpa TREO content, which would generate ~430m$au in revenue before concentrate payability deductions.
I don't know the payability for 60% non radioactive concentrate, so that would need some adjustments.
The 150ktpa target is a "long term" plan, when significant demand has materialized and several plants are operating.
At this point, the company should be worth orders of magnitudes more than now.
- Forums
- ASX - By Stock
- LIN
- LIN - Resource Connect Asia April 2023
LIN - Resource Connect Asia April 2023, page-20
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LIN (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $121.0M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.0¢ | $21.65K | 209.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 559300 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 224563 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 557300 | 0.100 |
2 | 58083 | 0.096 |
3 | 227000 | 0.095 |
1 | 356500 | 0.093 |
1 | 5000 | 0.092 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 202585 | 6 |
0.110 | 450456 | 3 |
0.115 | 300000 | 2 |
0.120 | 293636 | 6 |
0.125 | 137400 | 4 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
LIN (ASX) Chart |