I emailed Jaap Poll (md) and asked when will drilling commence in Thrace basin and he replyed "in June".
- Forums
- ASX - General
- link for oel in the newspaper attached
I emailed Jaap Poll (md) and asked when will drilling commence...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online