Yes it said reject, but I meant to say reinject.
if there is a connection between surface water or an upper aquifer used by the locals and the production zone then to avoid the drawdown of water from the surface or upper aquifer to the lower aquifer, then reinjection of water will be required.
I don't know what the EIS requires but it is technically possible to reinject fluid whether that be brine, processed brine or even basement groundwater into the aquifer to mitigate the drawdown impacts.
- Forums
- ASX - By Stock
- GLN
- Lithium brine degradation
Lithium brine degradation, page-21
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
|
|||||
Last
17.0¢ |
Change
-0.010(5.56%) |
Mkt cap ! $80.57M |
Open | High | Low | Value | Volume |
17.5¢ | 18.0¢ | 16.5¢ | $566.8K | 3.303M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 983448 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 166825 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 983448 | 0.165 |
12 | 542996 | 0.160 |
4 | 358396 | 0.155 |
11 | 525561 | 0.150 |
3 | 120000 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 166825 | 1 |
0.175 | 285000 | 4 |
0.180 | 163407 | 6 |
0.185 | 392137 | 9 |
0.190 | 86017 | 4 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online