Yes it said reject, but I meant to say reinject.
if there is a connection between surface water or an upper aquifer used by the locals and the production zone then to avoid the drawdown of water from the surface or upper aquifer to the lower aquifer, then reinjection of water will be required.
I don't know what the EIS requires but it is technically possible to reinject fluid whether that be brine, processed brine or even basement groundwater into the aquifer to mitigate the drawdown impacts.
- Forums
- ASX - By Stock
- GLN
- Lithium brine degradation
Lithium brine degradation, page-21
-
-
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
-0.005(3.85%) |
Mkt cap ! $77.48M |
Open | High | Low | Value | Volume |
13.5¢ | 14.0¢ | 12.0¢ | $631.2K | 4.867M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 62815 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 1163270 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 612828 | 0.125 |
23 | 1610799 | 0.120 |
12 | 3661377 | 0.115 |
24 | 1105875 | 0.110 |
29 | 1692837 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 1257376 | 17 |
0.135 | 600732 | 7 |
0.140 | 1021225 | 16 |
0.145 | 835729 | 9 |
0.150 | 195000 | 3 |
Last trade - 10.36am 10/10/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online