LTR 4.71% 91.0¢ liontown resources limited

Yes; this was raised at the AGM last year; however TO's respond...

  1. 75 Posts.
    lightbulb Created with Sketch. 1331
    Yes; this was raised at the AGM last year; however TO's respond at that time was that which I'll paraphrased, "We need to get Stage 1 up first with the planned processing rate of 2.5 mtpa for the first 4 years before upgrading it to a 4 mtpa readying it for Stage 2 expansion; it's this part that's require for the hydroxide processing currently planned for a 2029 start."

    https://hotcopper.com.au/data/attachments/4171/4171044-c06abd389282245f182048c80795997b.jpg

    The Downstream PFS is currently underway; we may see some improvement over the DSS but I'm not holding my breath for an earlier start not because of cash flow constrain (should the current spod price becomes the norm) but perhaps more on skill labour shortage; however TO believes this shouldn't be a problem once the we have Stage 1 up and running.

    As per the latest preso; Stage 1 is broken up into smaller works packages (to be responsible by different contractors) so that a delay for one part of the project would not be heavily hindered by another.

    https://hotcopper.com.au/data/attachments/4171/4171034-46c0cc72e55fa2c6263fd8125e239212.jpg
 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
(20min delay)
Last
91.0¢
Change
-0.045(4.71%)
Mkt cap ! $2.206B
Open High Low Value Volume
98.0¢ 98.0¢ 90.0¢ $24.20M 25.93M

Buyers (Bids)

No. Vol. Price($)
4 95000 90.5¢
 

Sellers (Offers)

Price($) Vol. No.
91.0¢ 10995 2
View Market Depth
Last trade - 16.10pm 03/07/2024 (20 minute delay) ?
LTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.