LTR 5.39% 79.0¢ liontown resources limited

Lithium Related Media Articles, page-24297

  1. 6,026 Posts.
    lightbulb Created with Sketch. 22360
    In general terms no ASX lithium producer don't give the details of their offtake contracts, they give mainly the tonnage but not the specs like grade, etc.

    The company said the spod produced atm has a weighted ave grade of 5.2% . That might be coming from the ore which was prepared for DSO shipments before. But it's the past. That ore now being sorted through the ore sorting machine and might be already converted to spod.

    More importantly we now have clean high grade lithium bearing ores are coming both from flat pegmatotes of Kathleen's Corner open pit zone and from underground tunnels atm.

    The cost of producing spod from these clean high grade ores will be quite low in comparison to other producers.


    On my post #:75112793 I posted this info;

    We have already started spod production and we also have huge amount of mined, crushed and sorted product waiting for processing.

    https://hotcopper.com.au/data/attachments/6366/6366325-1754be52c5b809b5303d4d23aecf26cc.jpg

    We have
    216kt clean ore at the ROM pad which is being now processed in the plant.
    That is a huge amount.
    We can produce around 40kt spod with that ore. (these images below are from old videos)

    https://hotcopper.com.au/data/attachments/6438/6438957-03593fd2eeb0ebe40394a123308bd66b.jpg

    https://hotcopper.com.au/data/attachments/6438/6438960-9783bd5ebae4cecf8e4cd4da358daa02.jpg


    We also have reached to the high grade FLAT pegmatites at the open pit of Kathleen's Corner.
    Mining high grade ore from there will be quite easy. It will be efficiently processed in the plant and converted to high grade spod. Here is one of the old cross sections of that area. You can see very high grade and FLAT pegmatites there.


    Mining a flat pegmatites is very low cost because there will be no **bro waste material in it, only the CLEAN lithium bearing ore. It's like scooping a cake from a plate.
    https://hotcopper.com.au/data/attachments/6439/6439123-dc90e4049b13c52f28ec0d66cb66f770.jpg
    https://hotcopper.com.au/data/attachments/6439/6439124-7c444fd3ad911ea288b063debf885c48.jpg

    Kathleen's Corner

    https://hotcopper.com.au/data/attachments/6439/6439049-30a615816149f147669d3245323aa159.jpg

    We have had 58kt crushed and stockpiled clean ore in plant.
    That sits between the primary crusher and fine ore bin. That ore was the ore fed to the plant for first production IMO. That makes more than 10kt spod concentrate when processed.


    https://hotcopper.com.au/data/attachments/6438/6438911-f8cf119476f99f89810ef9487657204f.jpg

    We also have 251kt are sorting product (OSP)
    which includes previously mined for DSO (Direct Shipping Ore) . This ore will be sorted and crushed in the OSP plant and will be feed to the process plant. That is a huge amount as well.


    https://hotcopper.com.au/data/attachments/6439/6439055-cdbf2f62ae96de297466ca35d5a4a42f.jpg

    We also have 11kt clean and sorted product
    which is I think being fed to the process plant.

    https://hotcopper.com.au/data/attachments/6439/6439051-1be6234d18c21901f3825a47a150afeb.jpg

    And now underground ore mining has started.
    That's the best ore type as it's also clean lithium bearing ore like the ore now coming from Kathleen's Corner.


    https://hotcopper.com.au/data/attachments/6439/6439140-1fc9fb6246f05a8c69ebaf1e3ea28b94.jpg


    https://hotcopper.com.au/data/attachments/6439/6439137-24e75f8385de15f8a235c39cc7981022.jpg
    https://hotcopper.com.au/data/attachments/6439/6439143-888a1b19ef2ffe4c6b63b97235ea1df1.jpg
    https://hotcopper.com.au/data/attachments/6439/6439145-930c9cc98f2d91232e43eceef86d6a91.jpg
    https://hotcopper.com.au/data/attachments/6439/6439149-d7dc8ed8300dbf61fd1aebd9b7eff508.jpg
    https://hotcopper.com.au/data/attachments/6439/6439151-d968dd556bd675e8b72e324704579c79.jpg





 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.