LTR 2.35% $1.46 liontown resources limited

Kathleen Valley project, Liontown Resources, Lithium, Mining...

  1. 6,564 Posts.
    lightbulb Created with Sketch. 3349
    Kathleen Valley project, Liontown Resources, Lithium, Mining services, News

    Liontown powers up Kathleen Valley

    Liontown

    Key wind turbine components for Liontown Resources’ Kathleen Valley lithium project have arrived on site.


    The turbines will generate 30 megawatts (MW) of wind power for the site’s 95MW hybrid power station that’s currently being developed by Zenith Energy.

    Zenith was awarded the contract for Kathleen Valley’s power supply in September 2022. As part of the contract, Zenith will finance, design, construct, own, operate and maintain the 95MW station for an initial 15-year term from first commercial operation.

    The hybrid power station is expected to have the largest off-grid renewable capacity of any mining project in Australia.

    The key components for the station arrived at the Port of Geraldton by boat, which were then transported to Kathleen Valley by road trains. More deliveries are expected to arrive at the site in the coming weeks.

    Liontown said works to assemble the first five turbines will begin soon, with each turbine to be over 210m tall and its blades to be 81m long.

    “With 46MW of emissions-free power generation capacity, the 95MW hybrid power station is expected to have the largest off-grid wind-solar-battery storage renewable capacity for a mining project in Australia,” Liontown said.

    “The power station’s design enables it to operate from 100 per cent renewable energy during periods of high wind and solar resource by switching to ‘engine off’ mode for its thermal components.

    “We are on track to operate with a low-carbon footprint from the outset at Kathleen Valley.”

    Liontown recently announced that underground mining at Kathleen Valley had begun.

    The Kathleen Valley project is located about 60km north of Leinster and 680km north-east of Perth in Western Australia. First production is scheduled for mid-2024.

 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
(20min delay)
Last
$1.46
Change
-0.035(2.35%)
Mkt cap ! $3.527B
Open High Low Value Volume
$1.49 $1.52 $1.46 $11.18M 7.628M

Buyers (Bids)

No. Vol. Price($)
1 24171 $1.46
 

Sellers (Offers)

Price($) Vol. No.
$1.46 15499 4
View Market Depth
Last trade - 16.10pm 21/05/2024 (20 minute delay) ?
Last
$1.46
  Change
-0.035 ( 1.71 %)
Open High Low Volume
$1.51 $1.51 $1.46 2032239
Last updated 15.59pm 21/05/2024 ?
LTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.