Maybe im a bit slow, but creating a link between our sulphate and why it was sent to canada for testing makes perfect sense now!
Stage 3 hydroxide plant - Commenced conceptual design study with tier 1
canadian engineering company.You only have to look at LTR recent hydroxide plant feasibility studies to see how much we could make from one.
![Smile](styles/default/xenforo/clear.png)