1MC 20.0% 0.3¢ morella corporation limited

The details of the modular design expansion were openly...

  1. 271 Posts.
    lightbulb Created with Sketch. 96
    The details of the modular design expansion were openly discussed by JB at the road show presentations last year and I believe at the AGM also. He spoke about the fact that another coarse plant was the quickest way to increase production at a much lower cost. Another fines circuit would be added when money was available.
    With all they have learnt and the upgrades to the plant that have been completed this year. I can only imagine that the cost of 2a would be higher than the original forecast of 60million But I also estimate that it would have a shorter construction and commissioning lead time and nameplate could be fast tacked.
 
watchlist Created with Sketch. Add 1MC (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.