SHANGHAI, Apr 29 (SMM) – The construction of a 45,000 mt/year lithium salt production project, invested by Ningbo Shanshan via a subsidiary Yongshan Lithium, commenced on April 29 at the Tongguan Industrial Park, Hunan province. With an investment of 2 billion yuan, the project is designed to assist Ningbo Shanshan to become an international lithium salt supplier with high-quality products and low costs.Phase-one project is designed with an annualised capacity of 15,000 mt of lithium hydroxide and 10,000 mt of lithium carbonate. Full operation of the second phase of the project is expected to bring about an output value of 3.3 billion yuan per year.
https://news.metal.com/newscontent/101101856/Ningbo-Shanshan-began-construction-of-45,000-mtyear-lithium-salt-project-in-Hunan
- Forums
- ASX - By Stock
- Lithium & The Future
SHANGHAI, Apr 29 (SMM) – The construction of a 45,000 mt/year...
-
-
- There are more pages in this discussion • 1,688 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 1MC (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.364M |
Open | High | Low | Value | Volume |
3.0¢ | 3.0¢ | 2.9¢ | $17.16K | 584.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 81157 | 3.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.1¢ | 374484 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 81157 | 0.030 |
2 | 347644 | 0.029 |
2 | 85700 | 0.028 |
1 | 61938 | 0.027 |
1 | 37074 | 0.026 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 364484 | 5 |
0.032 | 92168 | 2 |
0.033 | 378549 | 3 |
0.035 | 200000 | 1 |
0.040 | 40000 | 1 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |