From the update in October...
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02300339-2A1259461?access_token=83ff96335c2d45a094df02a206a39ff4
The Company has awarded the 3-well stimulation programme to Condor Energy Services Pty Ltd (“Condor”) and Condor has mobilized the stimulation programme equipment to the Horseshoe #4 well site (see photo below). The Horseshoe-4 stimulation will commence shortly.
...
Following the completion of the Horseshoe #4 stimulation programme, Condor will mobilize the stimulation equipment to the Horseshoe #2 well location to conduct a 2-stage stimulation programme targeting the same Triassic Basal Rewan targeted in the Horseshoe #4 well but also the deeper gassaturated Intra Wallabella sandstone. Following the completion of the Horseshoe #2 stimulation programme, the stimulation equipment and Condor crew will mobilize to the Warroon-1 well location to conduct a single-stage stimulation programme targeting the Rewan sandstone interval directly under the Showgrounds sandstone which has been the primary production interval for the Warroon Gas Field.
The entire three-well stimulation programme is expected to cost approximately $4.7 million and to be completed by the end of November 2020 with all three wells producing and flowing gas into Armour’s Surat Basin Gas Gathering System to the Kincora Gas Processing Plant for additional gas sales.
- Forums
- ASX - By Stock
- Litigation
From the update in...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AJQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.31M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AJQ (ASX) Chart |
Day chart unavailable
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Steven Gourlay, CEO
Steven Gourlay
CEO
Previous Video
Next Video
SPONSORED BY The Market Online